City of Larkhaven homepage

Menu

Call us

01632 960 000
Monday to Friday, 08:30 to 17:30

Harbour Bridge is closed from 06:00 on Saturday 24 October to 06:00 on Monday 26 October. Diversions and ferry times

Closed Consultation

Riverside Park restoration plans

We asked for your views on the detailed designs for the new playground, wetland boardwalk and tree planting in Riverside Park, and the restored park reopened on 3 October 2026.

You said, we did

1,146 people took part, including 212 children at workshops in six primary schools. Here’s what you told us and what we did.

You said: you preferred the nature play design for the new playground (62% chose Design B), but wanted more for older children and for disabled children.
We did: we built the nature play design and added an inclusive roundabout, a basket swing and a climbing area for 8 to 14-year-olds.

You said: the old playground got too hot in summer.
We did: we planted 18 of the 140 new trees around the playground to give shade as they grow, instead of putting up canopies.

You said: you wanted the longer boardwalk route, and it must work for wheelchairs and pushchairs.
We did: we built the 350-metre route through the reedbeds. It’s step-free, with passing places and resting points along the way.

You said: dogs on leads should be allowed on the boardwalk.
We did: dogs on leads are welcome everywhere except the fenced playground, which is dog-free.

You said: there weren’t enough places to sit.
We did: we added 30 new benches, most of them with armrests, along the main paths.

The restored park reopened on Saturday 3 October 2026.

Tall trees in vivid autumn colours arching over a leaf-covered path through a park.
Photo: Nikoneum, CC BY 2.0

This consultation closed on 31 May 2026. Thank you to the 1,146 people who took part. The “You said, we did” summary on this page shows what you told us and what we changed. The restored park reopened on Saturday 3 October 2026: read about the reopening.

Riverside Park closed in January 2026 for a £2.4 million restoration. Work to repair the river wall, drains and main paths is already under way. Now we’d like your views on the detailed designs for the parts of the park you’ll see and use most: a new playground, a wetland boardwalk and 140 new trees.

What we’re proposing

A new playground

We’ve drawn up two designs for the playground, which will replace the old one next to the main lawn:

  • Design A, Adventure: a large climbing frame with a tower and tube slide, swings and a zip wire
  • Design B, Nature play: timber climbing and balancing trails, a sand and water area, swings and a slide built into a grassy bank

Both designs include equipment that disabled children can use, and both would be fenced.

A wetland boardwalk

A raised boardwalk would take you through the restored reedbeds by the River Wren. There are two possible routes: a 280-metre loop close to the main path, or a 350-metre route that goes further into the wetland.

New trees

We plan to plant 140 trees, mostly native species. Tell us which parts of the park you’d most like to see shaded, and which open views you’d like us to keep.

How to have your say

  • Leave a comment at the bottom of this page.
  • Come to a drop-in session at Northbank Library on Saturday 25 April (10:00–13:00) or Wednesday 13 May (16:00–19:00).
  • Email haveyoursay@larkhaven.example.
  • Children can take part through workshops we’re running with six primary schools near the park.

What happens next

We’ll choose the final designs in June, taking account of what you tell us. The playground, boardwalk and planting will then be built over the summer, and we aim to reopen the park in the autumn. Find out more about our parks and leisure services.

6 comments

  1. Noémie Laurent

    Design B gets my vote. My two would happily spend all day on those balancing trails. Please think about shade, though: the old playground was a real sun trap in July and there was nowhere to sit out of the sun.

    1. Ciarán Moloney

      Agree about shade, but please use trees rather than sail canopies. The canopies in Hollins Park looked tatty after one winter.

  2. Zoltán Kovács

    I walk my dog here twice a day. I’m happy for the playground to be fenced, but please don’t make the boardwalk “no dogs”. Dogs on leads should be allowed, as they are on the rest of the riverside path.

    1. Larkhaven City Council Council response

      Thank you, Zoltán. Dogs on leads will be welcome on the boardwalk, as they are on the riverside path. The only dog-free area we’re proposing is the fenced playground, and we’ll make sure the signs make this clear.

  3. Gráinne Ní Mhurchú

    Two requests from a wheelchair user.
    Please add passing places on the boardwalk, because two chairs can’t pass each other on a narrow path.
    And please put benches with armrests along the main path so people can stop and rest 🌳

  4. Please go for the longer 350 m boardwalk. The far end of the reedbed is where the herons are, and it’s the best bit of the park. Any chance the riverside path can reopen before the rest of the park? It’s my commute by bike 🚲

This consultation is closed, so you can no longer comment. Thank you to everyone who took part.